| Major equipment | Solar Module(92,160 pcs, 450Wp) |
|---|---|
| Floating structure, mooring | |
| Inverter, underwater cable, electric room, etc. | |
| Grid Connection | Hapcheon Hydroelectric Power Plant/ Connecting the second 154kV switch yard |
Module
Mooring - Nylon rope
Mooring - Elastic body
Mooring - Concrete anchor
Floating structure
Underwater cable
Electrical panel
Inverter